Skip to content

The judgment stays yours. The paperwork doesn’t.

Your firm’s work in one record, starting with site visit reports and growing into the work around each job.

Request a demo

On a condition assessment at Brenmoor Court Condominiums, Kipta files S. Park’s photos by the places named on site and finds the firm’s two earlier jobs at the property. Kipta keeps each finding’s photo and note with it, and O-02 also cites the firm’s 2023 report. Drafting findings from site notes is planned. The engineer, D. Reyes, PE, writes each recommendation and accepts each finding. On a construction observation at Harlow Street Apartments, our team sets up the firm’s template from its past reports, and A. Hale, PE, writes the recommendation and accepts O-06. Next, Kipta will flag what’s missing before review. It will also draft replies to clients and find times for visits, for the office to send.

One report, and everything it takes to get it out the door.

Camera roll50 photos, unlabeled
Field notesField notes

stair B L2, crack longer?

3C bal. spall, rebar exp.

Last cycleLast cycle’s report

Find2023

Replace2026

Replace all

Old filesOld files to dig through
  • DOCXReportReport
  • XLSXSheetSchedules
  • PDFPlansDrawings
DraftsDrafts, saved again
Brenmoor v4 final?
Email, chatEmail and chat
  • Re: Re: board questions
  • Fwd: 2023 report (PDF)
  • Any update on the report?
RememberingTrying to remember

Was the Stair B crack 3 ft in 2023, or was that the other stair?

CommentsComments to resolve
  • Client14 comments
  • Partner6 comments
  • Client“see O-02”

Structural Condition Assessment

Due to the client Friday

And the job’s record, spread across all of these.

The work around every job.

Kipta starts with site visits and reports, and is growing into the rest of the unbillable work around each project.

Fieldwork. Every photo and note, filed where it was taken.

  • 1:12 PM
  • 1:41 PM
  • 2:52 PM
  • 3:14 PM
  • Stair BLevel 2, brick wall6 photos · 1 note
  • Unit 3CBalcony slab edge4 photos · 1 note
  • East stairPost base3 photos · 1 note
  • RoofSlab2 photos

Findings and sources. What each one rests on.

PellbrookO-02 · Immediate

Photo 2

Vertical cracking, brick stair wall

About 4 ft long and 1/8 in wide. Install crack monitors; reassess in six months.

Rests onPhoto 2Site note2023 report, p. 6

Accepted by D. Reyes, PESep 23, 2026 · 4:10 PM

The project record. Every job, together.

Brenmoor Court · 3 buildings
  • 26-0231Condition assessment2026
  • 23-0118Condition assessment2023
  • 21-0402Balcony repair2021

Drawing S-201Board’s email50 photos

Scheduling. Who goes where, week by week.

The week’s site visits, by person
MonNov 23TueNov 24WedNov 25ThuNov 26FriNov 27
DRD. ReyesBrenmoor9:00 AMOstrand1:30 PM
SPS. ParkWestmere10:00 AMBrenmoor9:00 AM
JOJ. OkaforHarlow St.8:30 AMHarlow St.8:30 AM
AHA. HaleOstrand8:00 AMWestmere2:00 PM

Visit briefs. What to know before you go.

Brenmoor CourtTue 9:00 AM

Last visit Sep 222 findings to re-check

Reported concerns

“Stair B crack seems longer.”

“Water at 6B again.”

Re-checkO-02O-03

Licenses by state. Who can sign where, and until when.

Who holds a license in each state
Licensed inNJNYPACTDEMD
D. Reyes, PEto Apr 2027
A. Hale, PEto Oct 2027
FirmAuthorization

No one is licensed in CT, so a project there can’t start.

Reports on your letterhead. Kipta will set findings in your sections, ready to sign.

Next

Pellbrook Engineering26-0231-R01 · p. 3

O-01Spalling at the balcony slab edge, with reinforcement exposed.

O-02Vertical crack in the brick stair wall, about 4 ft long.

Permissions. Who reads, and who writes.

  • DRD. ReyesOwner
  • AHA. HaleAdmin
  • SPS. ParkMember
  • LBL. BrandtViewer

A viewer reads; they can’t change a thing.

Client portal. Kipta will share issued reports with clients.

Planned

Pellbrook Engineering

to Brenmoor Court board

Your 2026 report is ready

Site visit report R01, issued and signed by D. Reyes, PE.

PDF26-0231-R01.pdf

Agreements. Kipta will draft them from past ones.

Planned

Brenmoor Court · next cycleAgreement

ClientBrenmoor Court board

ScopeBalcony inspection, as in 2026

FeeFor a principal to set

Kipta will draft it from the 2026 agreementFor A. Hale to send

Client updates. Kipta will draft them.

Planned

Brenmoor Court boardRe: Brenmoor Court report

Any update on the report?Tue 8:14 AM

It’s with D. Reyes, PE for review. Four of five findings are accepted, and we expect to issue it Friday.

Kipta will draft it · for D. Reyes to send

Inspection cycles. Kipta will plan them.

Planned

Cycles coming due4 properties

Ostrand · façade2027Last cycle: 4 findings, 1 unsafe

Westmere · milestone2028Last cycle: 2 findings

Brenmoor · balconies2029Last cycle: 3 findings

Next to set upOstrandKipta will plan the visit from last cycle

Invoicing. Kipta will prepare them.

Planned

Invoice · Brenmoor Court26-0231

Site visit, Sep 223.5 h$612.50

Report R016.0 h$1,050.00

Client call, Oct 20.5 h$87.50

Total$1,750.00

DraftedSentPaid

Kipta will prepare it for the office.

Every report carries a firm’s name, an engineer’s license, and a client’s next decision. Kipta is built for that weight.

  • Condition assessments
  • Construction observation reports
  • Façade inspections
  • Balcony inspections
  • Parking garage assessments
  • Special inspection dailies
  • Reserve studies
  • Forensic reports
  • Field reports
  • New Jersey structural inspections
  • New Jersey reserve studies
  • NYC façade inspections (FISP)
  • NYC parking structures (LL 126)
  • Florida milestone inspections
  • Florida reserve studies (SIRS)
  • Miami-Dade 30-year recertification
  • Broward building safety inspections
  • California balcony inspections (SB 721)
  • California condo balconies (SB 326)
  • San Francisco façade inspections
  • Chicago façade ordinance
  • Boston façade ordinance
  • Philadelphia façade inspections
  • Pittsburgh façade inspections
  • Cleveland exterior wall inspections
  • Cincinnati façade inspections
  • Milwaukee façade ordinance
  • Maryland reserve studies
  • Virginia reserve studies
  • Nevada reserve studies
  • Washington condo reserve studies
  • IBC special inspections
  • Single-family homes
  • Townhouses
  • Apartment buildings
  • Condominiums
  • Mid-rise residential
  • High-rise residential
  • Parking garages
  • Schools
  • Hospitals
  • Office towers
  • Retail centers
  • Warehouses
ReportsPrograms they answer toBuildings

Back at the desk, the visit is drafted.

Your team’s notes and photos become findings in your firm’s wording, on your letterhead, set up from your past reports. Nothing goes in until the professional who signs accepts it.

The cover, the photo log, and the cited files

Pellbrook EngineeringPage 3 of 12

3 · Observations

  • S. Park’s note3C bal. slab edge spalled along rail, bar exp.
    O-01Spalling at the balcony slab edge along the rail, with reinforcement exposed.
  • S. Park’s notestair B L2 brick wall, vert crack ~4 ft long, ~1/8 in wide, longer than last time
    O-02Vertical crack in the brick stair wall, about 4 ft long and about 1/8 in wide.Cites A, p. 6Cause: left for D. Reyes, PE
  • S. Park’s noteE stair post base, pack rust, section loss at plate
    O-03Pack rust at the steel post base, with section loss at the plate.Needs a recommendation

And O-04 and O-05 on the next page

Drafted from S. Park’s 50 photos and 6 notes · Waiting for D. Reyes, PE to review

Nothing goes out under your name until you decide it.

Every finding shows what it rests on. You answer what’s left, change any words, and accept it. Every change is kept with who made it and why.

Page 3 · O-02

What it rests on

Photo

Stair wall, from site

Field note

stair B L2 brick wall, vert crack ~4 ft long, ~1/8 in wide, longer than last time

2023 report

“Crack about 3 ft. Monitor.”

What you decide

The draft

Vertical crack in the brick stair wall, about 4 ft long and about 1/8 in wide.

Cause Left for you

Your answerCause undetermined.

Recommendation

DraftedRepoint and monitor.You changed it toInstall crack monitors; reassess in six months.

D. Reyes, PE accepts it. Only the professional who signs the report can accept, one finding at a time. The report goes out when every one is.

See it on your own report. Request a demo

Every report in your standard. Every decision on record.

Whoever writes it, every finding comes out in your firm’s words and form, with nothing they noted left out. Each one keeps what it rests on and who accepted it.

  • S. Park’s note · Brenmoor Court

    stair B L2 brick wall, vert crack ~4 ft long, ~1/8 in wide, longer than last time

    In your firm’s words

    O-02Stair B, level 2

    Vertical cracking, brick stair wall

    About 4 ft long and about 1/8 in wide. Cause undetermined. Install crack monitors; reassess in six months.

    Accepted by D. Reyes, PE, Sep 23, 2026

    Rests on Photo 2, the note, and the 2023 report

  • J. Okafor’s note · Ostrand Apartments

    Bal 5A - slab edge spalled, rebar exposed & rusted, approx 6x10 in

    In your firm’s words

    O-04Unit 5A balcony

    Spalling, balcony slab edge

    About 6 in by 10 in, with reinforcement exposed and corroded.

    Accepted by A. Hale, PE, Oct 2, 2026

    Rests on Photos 4 and 5, and the note

  • M. Chen’s note · Westmere Lofts

    N elev L4 veneer: stepped crack thru mortar jts. water stain inside 6B below

    In your firm’s words

    O-01North elevation, level 4

    Stepped cracking, brick veneer

    Stepped crack through the mortar joints; water staining inside unit 6B, below.

    Accepted by D. Reyes, PE, Oct 9, 2026

    Rests on Photos 1 and 2, and the note

Where Kipta is going: the work around every job, drafted from one record.

Site histories, visit times, the next cycle, briefs, status, replies, and renewals, each ready for a person to check, decide, or send.

The firm’s record

  • Visits
  • Files
  • Email
  • Calendars
Stair B’s historyThe site’s history, by place
  • 2023 · 3 ftabout 3 ft
  • 2026 · 4 ftabout 4 ft
For D. Reyes, PECheck
Next visit timesTimes for the next visit

Ostrand Apartments, spring

  • Tue 9:00
  • Wed 1:30
  • Thu 10:00
For the officeSend
The next cycleThe next cycle, set up

What to look at again.

For S. ParkRecheck O-02
A new engineerA new engineer, briefed
  • Brenmoor Court
  • 3 visits
  • 6 findings
  • 2 open
For L. BrandtRead
Every job’s stageWhere every job stands
  • BrenmoorBrenmoor CourtSignerWith the signer
  • OstrandOstrand Apts.DraftedDrafted
  • WestmereWestmere LoftsIssuedIssued
For A. Hale, PEDone
A reply to the boardA reply to the board

Re: Any update on the report?

For D. Reyes, PESend
Answers to commentsAnswers to comments

Each drafted from the record, with its page.

For D. Reyes, PE2 to decide
A renewalA renewal

Last cycle’s scope, for the board.

For A. Hale, PESend

Let Kipta take the drafting off your desk.

What Kipta takes on today

  • Each visit captured on site, every photo and note filed by where it was taken
  • Each finding citing the photos, notes, and files it rests on
  • Only the professional who signs can accept a finding
  • Your clients, properties, projects, and site visits in one record

What stays yours

Every judgment, and the signature on the report

What happens when you ask

  1. 1You send your work emailNothing else is needed to start.
  2. 2We find a timeBring your team if you’d like.
  3. 3A conversation and a demoHow you report today, and Kipta as it works now, with what’s next said plainly.
  4. 4If it fits, a paid pilotWe set it up from your past reports, with what success means agreed before it starts.

Not ready?